UNSOLVED

f311

updated

14 years ago

F

f311

13 Posts

0

161273

June 25th, 2012 05:00

Order processing and delivery times.

Ok hi, I just ordered a new desktop, and it says it wont arrive till the 26th of july and it has said its processing the order for the last few days now.

So my questions are: How long does it take for the order to be processed (deposit's already taken)? and will it really arrive on the 26th? or is that just a very rough date to cover themselves?

  • T2L

    14 Posts

    3373

    0

    Posted June 25th, 2012 07:00

    LONG lead time. What did u order? Even a complex custom order would be quickly processed once the parts were available and it reaches the front of the queue. Location may be the biggest factor. Where roughly are u located. In my experience the deadlines quoted can be weeks in excess of actually door delivery dates. Makes it even MORE delightful when it turns up unannounced. Currently I'm one week into antipated delivery date of July 4th.

  • T2L

    14 Posts

    3373

    0

    Posted June 25th, 2012 07:00

    Hope it arrives dry after the recent deluge haha. I'm just across the water in Belfast. Ordered laptop M17xR4 3d with SSD.

    Eta July 4th but eagerly anticipating every day. Very excited myself. Good luck with ur purchase.

  • f311

    13 Posts

    3373

    0

    Posted June 25th, 2012 07:00

    Hey, thanks for replying :)

    I ordered an alienware aurora

    Processor : Intel Core i7-3820 (Four Core, 10MB Cache) 3.60GHz

    Memory : 8192MB (4x2GB) 1600MHz DDR3 Quad Channel

    Graphics : 2GB GDDR5 NVIDIA GTX 680

    Im in the uk, North Wales to be exact.

  • f311

    13 Posts

    3373

    0

    Posted June 25th, 2012 08:00

    When I was ordering my computer it didnt even give an option at all, hope it actually has one, lol!

  • warren71

    85 Posts

    3373

    0

    Posted June 25th, 2012 08:00

    mine was ordered on the 14th june arriving on the 27th already have a SSD bought a 512GB cheaper than dells 256gb and im in South wales

    213-15808 Processor : Intel Core i7 3820QM (8MB Cache, up to 3.7GHz w/ Turbo Boost 2.0) 1

    230-12513 " WideFHD (1920 x 1080) WLED LCD 1

    319-10774 Camera : Integrated Skype HD Certified FullHD Camera with dual digital microphones 1

    320-12436 LCD Back Cover : Soft Touch - Stealth Black 1

    340-29243 Ship Accessory : Western Europe Docs (EN, FR, IT, GER, DUT) 1

    340-29315 Placemats : Placemats (Eng, Fre, Ger, Ita, Dut) 1

    340-29314 Resource DVD : Alienware M17x 1

    370-22689 Memory: 12288MB 1600MHz Dual Channel DDR3 (2x2GB + 2x4GB ) 1

    400-25398 Hard Drive : 64GB mSATA Boot Drive + 500GB SATA (7,200rpm) 1

    429-16501 Optical Drive : BluRay Combo (Blu-ray read only, DVD, CD read & write) 1

    450-13572 Power Cord : UK 250V 1

    450-16348 Power Supply : Alienware 240W AC Adapter 1

    451-11606 Battery : Primary 9-cell 93W/HR LI-ION 1

    490-13762 Graphics : 2GB GDDR5 AMD Radeon HD 7970M 1

    510-10451 Sound Card : Creative Sound Blaster Recon3Di with THX TruStudio Pro Software 1

    555-14432 Wireless : Killer Wireless-N 1103 1

    583-15802 Keyboard : Internal UK/Irish Qwerty Keyboard 1

    619-32223 Operating System : English Windows 7 SP1 Ultimate (64 BIT) 1

    640-12302 Software : Datasafe Local 2.0 Basic 1

    640-12352 Software : Dell Support Center 3.0 1

    644-10025 Avatar : Alienhead 3D 1

    650-14174 Anti Virus : Not Included 1

    656-10015 AlienFX Colour : Plasma Purple 1

    754-56825 Standard Service - 1 year of Next Business Day coverage included with your PC 1

    754-61390 3 Year Hardware Support - Next Business Day 1

    755-10608 3 years Accidental Damage Protection

  • f311

    13 Posts

    3373

    0

    Posted June 25th, 2012 09:00

    An option for a PSU that is.

  • ricecakes26

    1 Message

    3373

    0

    Posted June 25th, 2012 09:00

    Hello, I ordered mine on May 26th and it came June 6. I live in Hawaii and I did some customizations. It depends on what form of payment you have. are you using a credit card or through a dell preferred account? In my case, they needed to call me and confirm all the information I put in to finally process the order. Your order is estimated to arrive on the 26th because they are assuming the worst case scenario. It shouldnt be that long. Build time usually takes 6--10 days depending on parts availability. and then. depending where you are from. It should take 5 days to 2 weeks to ship.

  • 3373

    0

    Posted June 25th, 2012 10:00

    Hey guys, I ordered mine (M17xR4) on the 18th, but its still in pre-production.

    My estimated delivery is the same as T2L - the 4th of july (pretty much the same spec too).

    What stage is your order at now T2L?

  • T2L

    14 Posts

    3373

    0

    Posted June 25th, 2012 12:00

    In limbo?  Haha. Per-production,, but I think they are ready to dispatch, but the status update remains unchanged. I'm happy with that. Fingers crossed.

  • warren71

    85 Posts

    1159

    0

    Posted June 25th, 2012 14:00

    mines coming from shangai china