How does dell promise the “shipping” and “delivery” dates?
So I been looking at the forums and post that people make about the delayed orders for their products and it got me wondering how dell can promise the product will be built and shipped by the purposed date.
If you are talking about the timeline on the ordering status page, I am pretty sure it is based off the most up to date information they have available. But it will change, pending on all the factors that can affect assembly and shipping.
I have placed 3 orders in the past 10 months, 2 Alienware systems and 1 G laptop system, and shipping times were acceptable and within roughly 3 weeks.
I think production never stops, but I think they only start once all parts are confirmed and available. Otherwise they would have to put the system aside half finished and continue some other day, and that would not be good.
If it helps, on my orders it jumped ahead fast, but if I am not mistaken it was delivered much faster than the expected delivery date was showing on the tracking screen.
Thank you. I been getting antsy with how close the shipping date is coming and there’s been zero update at all. The best info I gotten so far was the part that was in shortage is the 128GB Dual Channel DDR4.
that brings up another question. How far into the week does the prosecution start? I know it depends on a variety of things and such.
Vanadiel
8 Professor
•
7094 Posts
•
29695 Points
1341
0
Posted July 13th, 2021 12:00
If you are talking about the timeline on the ordering status page, I am pretty sure it is based off the most up to date information they have available. But it will change, pending on all the factors that can affect assembly and shipping.
I have placed 3 orders in the past 10 months, 2 Alienware systems and 1 G laptop system, and shipping times were acceptable and within roughly 3 weeks.