changing ip/hostname on navi side with an existing navi hostname/ip
Hi,
eThe OS is solaris 9, 10.We are migrating the luns from one host(solaris 9) to an E25K running solaris10. Since the old host is currently still production, we had to temporarily name the new host something different with a temp ip to test connections, HBA's, veritas etc.. All works so now we want to migrate.
Both have hosts/storage groups defined through navi on our emc. We want to move the prod luns over to the new host and change the ip of the new host to reflect that of the old host along with the hostname. I plan on deselecting the luns on the current host, selecting them on the new host, discovering them, and then powering off the current host. At that point I want to update the ip/hostname with the current host, remove the temp ip/ hostname and reboot.
Will navi see two hosts with the same name, or will it recognize the changes successfully?
I looked at the doc and it was quite helpful. One question, when should I do this, (stop/start agent, delete Hostidfile.txt) before or after I am going to boot the ip from the old machine to the new one? You mention after I power down the old machine, but I was unclear on when I should follow the procedure. I am a newbie on the navi side so any extra information would be helpful.
Let me give you a more detailed plan, if i were doing this migration:
1) i would present existing Prod luns to my new host, so that system admins can configure PowerPath or Veritas DMP, as long as they don't mount the LUNs there is not problem there. This could save you some time during the migration as you will be able to verify that PowerPath/DMP can see all devices and everything is fine SAN connectivity wise. (this step is optional)
2) Shutdown old prod server. 3) Go into Navisphere, right click on the array and go into Connectivity status. The old host name will be in a very light color ...and it will say "logged in - NO". At this point i would deregister the WWNs for the old server. 4)Rename/Re-IP the new server, stop agent, delete the file, start agent. 5)At this point if you go back to Connectivity status, the temporary name should have changed to the new name. 6)bring over luns (unless you used step 1)
post back if you need help with any of these steps
Thank you so much! I really appreciate the level of detail and assistance. I feel much better about the migration. I will be doing this tomorrow morning and will follow from step 2 on. I was able to create some test luns and test DMP beforehand. I will post my progess in the am.
good luck, also ..i don't think it matters much ..but you might want to remove the old prod server name from its storage group after your shut it down, and then follow step 3. It will be cleaner that way. Also ..when you go back to Connectivity status to check if the name of the temporary server changed ..also check the Failover mode ...make sure it's 2 (DMP)
dynamox
11 Legend
•
20419 Posts
•
87439 Points
796
1
Posted April 6th, 2007 13:00