Ordered a new XPS 15 Sun Feb 7 - old one dying fast. Was given delivery date March 18. Looked on Monday Feb 8th and new deals were announced. If I cancel my Feb 7 order and place a new order for the EXACT SAME CONFIGURATION with same everything but pay $211 more, then the delivery date will be Feb 22! That is very upsetting!
Called order support twice and got read the "script". Asked for a supervisor on Feb 8 and girl went away and came back and just repeated what she had said before. Called today (Feb 9) and demanded a supervisor who said orders were built as received. I think that's how it should be, but they're telling me on their website I can get the exact same setup 3 weeks earlier if I pay $211 more. SO FRUSTRATING when my current XPS is dying and I do CAD design for a living.
Anyone think I have ANY chance of getting my XPS 15 before the March 18 date or should I even expect it by that date? Thanks.
I placed an order for a Dell XPS 15 with a very standard configurations, that is 16GB of memeory and 512 GB SSD and an UHD touch screen. The estimated ship date is March 23 and delivery date is April 1 which is roughly a 2 month leadtime. I found it is very frustrating to spend $2,600 for a laptop and have to wait that long for it. Since laptop is a commodity and I really dont know why we need to wait for that long for a laptop from a manufacurer.
Some others have the UHD, but generally with larger drives and faster GPUs, with higher prices to match.
Bottom line: if you need a system quickly, you're going to decide between waiting for a custom order, or finding something close to what you want in stock with a reseller. There's no end in sight to the shortages of computer systems -- notebooks and desktops (particularly the latter with faster GPUs) alike.
patherlee
4 Posts
203
0
Posted February 12th, 2021 12:00
I placed an order for a Dell XPS 15 with a very standard configurations, that is 16GB of memeory and 512 GB SSD and an UHD touch screen. The estimated ship date is March 23 and delivery date is April 1 which is roughly a 2 month leadtime. I found it is very frustrating to spend $2,600 for a laptop and have to wait that long for it. Since laptop is a commodity and I really dont know why we need to wait for that long for a laptop from a manufacurer.