Interesting discussion. IHAC that wants a proof that data are actually being encrypted, he won't accept a "believe me it's done". Is there something like an officially EMC-recommended way to deliver this proof to a customer that demands it?
well, since i can only assume that there is not or not yet: how exactly would one - after removal of an encrypted disk "see if you can see the cleartext"? attach it to a SAS Controller in another Computer and seek through the Contents with an Editor? sorry for asking that stupid, but i just don't get it entirely.
Ok, but would that imply concrete steps to perform on live equipment to show compliance "hands on" or just the compliance certification as kinda documented "we comply"? Plus i need to deliver this proof as part of a test plan during a PoC on a Vblock340, which we are currently about to implement on the customer's site. It's one of his most crucial criteria to "see" the encryption instead of plain text. The PoC will last 90 days, so I need a quick procedure to proove this that the customer would agree upon.
I need to validate the correct functioning and presence of D@RE in VMAX 20K installed a month back. What is the procedure for the same, I observed in the discussion that you also had the same problem what was the solution to your problem?
P.S. Removing the disk and checking if data is in cleartext will not help.
Rainer_EMC
6 Operator
•
8645 Posts
1225
0
Posted September 5th, 2014 03:00
Yes we (EMC) do test our product
Most simple test – write to an encrypted disk – remove the disk from the array and see if you can find the cleartext of the data
For details one DARE please see the white paper https://www.emc.com/collateral/white-paper/h13296-dare-wp.pdf
It says that we are working on FIPS 104-2 validation validation