M1000e I/O Module Install Order
Hello,
Hoping someone can help. I have been reading the hardware guide for the M1000e blade Chassis, trying to figure out what is required to install 2 new Brocade 5424 Fabric Modules into the chassis. The chassis is currently up and running with the following modules installed:
A1 = Ethernet Module
A2 = Ethernet module
B1 = Blank
B2 = Blank
C1 = Blank
C2 = Blank
I want to install the new switches into C1 and C2. My question is, as it is required to install modules from right-to-left, does that mean I must first remove the module in A1. Then install module C2, then C1 and then put A1 back in? This confuses me a bit and the documentation doesn't say what to do.
Can anyone help? My Blade Servers are not teamed between A1 and A2 switches and lots of I/O happens out of A1 - so obviously if I can avoid causing an outage then great! Thanks in advance.