Tress pass all the luns on one SP to the other manually and reboot that SP . After successful reboot , Tresspass all the other luns on the other SP then reboot.
After its successful reboot, bring back all the luns to its original owners.
If you are thinking about shutting down the entire CX400 unit and restarting the same, the process will be different. The reboot of only one SP is considered here. If you need to have the proper Power-down(shutdown) and Power-up procedure, please let us know - or refer to Customer CLARiiON Procedure Generator available on powerlink to build the CX-series power down procedure.
amrith
1 Rookie
•
76 Posts
657
0
Posted March 18th, 2008 01:00
So,to safely reboot the SP :
Tress pass all the luns on one SP to the other manually and reboot that SP .
After successful reboot , Tresspass all the other luns on the other SP then reboot.
After its successful reboot, bring back all the luns to its original owners.