VNX-1 to VNX-2 migration using MirrorView/A

We plan to migrate our VNX-5500 to VNX-7600. Challenge we have is the Source VNX-5500 is full on capacity with just 20% of  free space available and Migration needs to have minimal downtime. We wanted to explore MirrorView/A option for data migration.

1: Can we use the secondary Image after a successful Sync/Consistent Fracture for the DataBase?

2: Does MV/A cleanup requires any special care after the Fracture?

3: Any other key-item need to considered?

Thanks.

  • dynamox

    11 Legend

    •

    20419 Posts

    •

    87439 Points

    426

    1

    Posted June 26th, 2016 06:00

    1) why not, that is what it's for.  Shutdown the app/DB, let it get to synchronized state and than fracture it. This will ensure application consistent copy.

    2) if after fracture you are done with the migration, you will need to delete secondary from mirrorview group and then delete the group itself.

    3) Can't think of anything special, crank up the speed to High so you don't wait very long, MirrorView is not that fast compared to other replication products from EMC (recover point/SRDF). Have new zones ready for 7600, when system is down for "final" sync, drop 5500 zones from active zoneset and add 7600. After you fracture secondary, i would create snapshots of those LUNs first before you try to bring up DB. In case you have issues and want to start from start, you can easily roll back from the snapshot instead of monkeying around with MirrorView.

  • 426

    0

    Posted June 29th, 2016 13:00

    Thanks Dynamox this is helpful!