Hi,
I installed avamar 5.0.409 on 1 TB appliance and 05. Tb. ave. Dell server was on production environment and ave was on disaster site. I configured ave, for 0.5 tb configuration. Before replication configuration ave's disk size seems 540 GB and everything is ok. When I started replication between this servers. Ave's disks native sizes decreased from 180 gb to 113 gb on EM and MCS. Total disk size seems 340 gb for virtual appliance after startting replication. (For all disks Data01 Data02 and Data03) When I checked disks on OS everything is ok. I re-import the image after this but same behavior appeared again. I wating for your advices.
Support need to carry out a health check on the system but that can only be done if the system is getting full, otherwise the performance levels will not be representative of the levels seen at high load.
If the system is getting full you can open an SR asking for a health check on your AVE system to check if the limit can be raised.
Just one thing to note - at this time AVE 5.0 is available with only limited availability. Make sure you've arranged special dispensation through EMC sales & product management to run that version or you may have difficulties engaging support for a product which has not yet been made generally available.
AVE systems are set with an initial read only limit of 2/3 the 'final' read only limit. So, for a 0.5TB AVE you will have two thirds of that capacity to begin with.
As the system fills up and triggers the health check limit the customer is prompted to contact support in order to carry out a health check. The read only limit can then be raised to its final level by the support team provided that the health check indicates that the virtual machine's performance is high enough to work at full capacity.
Customer facing documentation on this seems sparse so I've requested that we improve the AVE guide to clarify this point.
Avamar Exorcist
462 Posts
690
0
Posted April 12th, 2010 06:00
Support need to carry out a health check on the system but that can only be done if the system is getting full, otherwise the performance levels will not be representative of the levels seen at high load.
If the system is getting full you can open an SR asking for a health check on your AVE system to check if the limit can be raised.
Just one thing to note - at this time AVE 5.0 is available with only limited availability. Make sure you've arranged special dispensation through EMC sales & product management to run that version or you may have difficulties engaging support for a product which has not yet been made generally available.