UNSOLVED

polska14

updated

17 years ago

P

polska14

79 Posts

0

1062

November 17th, 2009 07:00

NW Upgrade from 7.2.x to 7.5.1 (and 32 to 64 bits too)

Hi all,

Can be made a Networker upgrade from 7.2 version (on W2K3 32 bits platform) to 7.5.1 (on W2K8 64 bits) directly? NW Procedure Generator doesn't consider this option, and I can't find docs on Powerlink about this.

Regards.

  • ble1

    6 Operator

    •

    14354 Posts

    •

    56186 Points

    357

    1

    Posted November 17th, 2009 07:00

    As long as it is Windows box, it should work no matter 32bit or 64 bit.  Your biggest challenge is to make sure old and new box have the same name (network properties) and hosts sets.
  • PrinceAijaz

    1 Rookie

    •

    38 Posts

    357

    0

    Posted November 17th, 2009 07:00

    Hello Sir,

    I would suggested upgrading to 7.4.X to first and then go for 7.5.x. You need to install upgrade enabler first and then start the upgrade process.

    Before upgrade make a copy of res/mm and index folder. Please note nwadmin is no more avialable beyound 7.3.x. We have NMC.

    Regards

    aijaz

  • Holger_Inf

    1 Rookie

    •

    122 Posts

    357

    0

    Posted November 17th, 2009 07:00

    Upgrade with archtiecture migration (32Bit -> 64 Bit) or Platform migration is only supported if done by EMC proffesional service or selected Partners.

    The migration can not be done in the same step as the update, must be at same major version of networker.

  • ble1

    6 Operator

    •

    14354 Posts

    •

    56186 Points

    357

    0

    Posted November 17th, 2009 07:00

    Should be possible, but it would not be recommended as if things go wrong you have multiple things to consider and research then.
  • polska14

    79 Posts

    357

    0

    Posted November 17th, 2009 07:00

    Hi Hrvoje,

    Ok. What about migration from 32 to 64 bits? Do you have made any similar?

    Regards

  • jrinehart1

    28 Posts

    357

    0

    Posted November 30th, 2009 10:00

    Is it 15? That's good information to know. I've never let it lapse a day so I just assumed that you had the 30 day license grace period! That's what I get for assuming
  • polska14

    79 Posts

    357

    0

    Posted November 30th, 2009 10:00

    Thanks, Jason. Very detailed explanation. Comment about 12: there are only 15 days to rehosting licenses (but take only a few minutes thru Powerlink).

    Regards.

  • jrinehart1

    28 Posts

    357

    1

    Posted November 30th, 2009 10:00

    I just went through a similar upgrade path. I would recommend that you upgrade Networker first and make sure it is working before you change platforms. And as always, take a bootstrap and index backup BEFORE you do anything.

    1. Bootstrap/Index backup

    2. Upgrade Networker

    3. Add upgrade enabler

    4. Test for problems

    5. Bootstrap/Index backup

    6. Power down old server

    7. Setup new server (recommend using same name and IP)

    8. Fresh install of Networker 7.5SP1

    9. Configure drives

    10. Restore Bootstrap/Index using mmrecov (follow Networker DR Guide)

    11. Reboot new server and test

    12. Contact licensing and request a host transfer for your licenses as quickly as possible (although you have 30 days)

    I migrated from NW 7.5 to NW 7.5SP1 (which is not as drastic as 7.2 to 7.5.1) and then moved from Server 2003 32bit to Server 2008 64bit. In hindsight I would've went to Server 2008 R2 64bit instead (which is in the works). But remember to always backup your CFI and Media DBs before you do anything.

    Good luck!