In 8.1.0.2 when ever Multiscan job run the nodes in the cluster splits. TSE suggested to run disable the multiscan job and schedule the Collect and Autobalance Jobs with low impact. Is there any patches to fix this issue in 8.10.2 or do we need to upgrade to latest code 8.1.2. But the latest code is released in AUG/2018. Is it good/worth to upgrade to latest code. Any suggestions?
We have run into major issues with lwio process getting as large as 24GB in size and then refusing smb client connections. We have discovered it has to do with smb openfiles not getting closed. We are still working with Dell EMC for a solution. We have devised a work around by restarting IIS servers using Isilon smb storage every few hours. This is a pretty bad situation for is and hope EMC figures out what changed between 8.0.0.7 and 8.1.2.0. We did not have this problem in 8.0.0.7.
I'm having an issue with uninstalling the kernel patch KGA_RUP_2019=05_249622 on the OneFS Simulator of the same version as our cluster (now 8.1.2.0). It does node 1 and then just hangs in the Uninstalling state. It's got me concerned that we'll have the same issue when we try to uninstall on Production. Even though the simulator is unsupported, I'm going to try opening an SR about it. At the very least I'm going to open an SR in preparation of our attempt to uninstall the patch, so I hopefully can get immediate support.
PierceCJ
18 Posts
6978
3
Posted February 26th, 2019 09:00
We had recently upgrade from OneFS 8.0.0.6 to 8.1.2.0 and encountered few issues and weirdness.
1. SyncIQ jobs are intermittently failing on both clusters.
2. WebUI timeout very quick
3. Non-stop log entries in /var/log/messages
4. InsightIQ alert for Isilon data retrieval delayed
#1 was resolved. Still have open SRs on the #2 & #3.