UNSOLVED

Toro1975

updated

20 years ago

T

Toro1975

1 Rookie

•

80 Posts

0

15118

October 3rd, 2006 23:00

Only For xps 410 (Shipping Problems)

Order on 9/25 abd Shio Date is 10/25

(CS of dell told me the problem is back order CPU and System Problem)

Intel Core Duo Processor E6300 (1.86GHz, 1066 FSB)
Memory 1GB Dual Channel DDR2 SDRAM at 533MHz- 2DIMMs
Keyboard Dell USB Keyboard
Monitor 19 inch E196FP Analog Flat Panel
Video Card 256MB nVidia Geforce 7300LE TurboCache
Hard Drive 250GB Serial ATA 3Gb/s Hard Drive (7200RPM) w/DataBurst Cache

And in the this formu Im the Only one to order the E6300 And wy is back order
Sorry My english Im italian An live in USA
  • thebob23

    24 Posts

    301

    0

    Posted October 3rd, 2006 23:00

    I also ordered on 9/25 and my estimate ship date is 10/24, and i also ordered the Intel Core Duo Processor E6300, so basically I'm in the same boat as you if it is the E6300 that is the reason for the delay. Hopefully it can be cleared up soon.
  • Toro1975

    1 Rookie

    •

    80 Posts

    301

    0

    Posted October 3rd, 2006 23:00

    I hope so Becouse is ridicolous
    (I worck in a computer store and in 3 days ar system was done end delivered)
  • Cystum

    69 Posts

    301

    0

    Posted October 4th, 2006 00:00

    You guys are not alone. I also ordered mine on 9-25.
  • BubBowen

    635 Posts

    301

    0

    Posted October 4th, 2006 00:00

    Hi ChrisM,
     
    So what's the story with the XPS410/9200 starting shipping again last Friday?  Was that on a limited basis or is this current delay on top of the other one?
     
    Thanks!
     
    Bub
  • BmBrAnDX

    12 Posts

    301

    0

    Posted October 4th, 2006 03:00

    I'm in the same boat you guys are except I ordered on 9/20. My shipdate is for Thursday, but I don't see that happening at all.

    Core 2 Duo Processor E6600
    2GB DDR2 SDRAM at 533MHz
    256MB NVIDIA GeForce 7900 GS
    Serial ATA RAID 0 With Dual 250GB
  • tinlong

    15 Posts

    301

    0

    Posted October 4th, 2006 04:00

    Hey guys,
     
    I've also ordered Dimension 9200 with E6300, except one thing: I've ordered it on 9/9, MUCH earlier than you all :smileysad:
     
    Others received their XPS 410 / Dim 9200 are mostly with E6600 or other variation of Core 2 Duo, so I suspect that it's really only E6300 in back order...
  • tomo_mate

    8 Posts

    301

    0

    Posted October 4th, 2006 09:00

    Hey Guys,

    I live in Australia, ordered on the 9th of September with estimated shipping date of 16th of October and was updated today saying it is in Pre-Shipment. So hopefully get it after the weekend. :)

    E6400
    2Gig Ram
  • winnieB

    2 Intern

    •

    1058 Posts

    301

    0

    Posted October 4th, 2006 16:00

    mine was ordered sept 14, and I am still waiting since it has been in the "boxing" stage for two week now. ha! what a joke!
  • 301

    0

    Posted October 4th, 2006 19:00

    Just talked to Dell.  Or tried to since I could barely understand the person on the other end.  Anyway, I ordered on Sept. 23.  Status bar says delivery October 23.  Today told to expect delivery in 3-5 days.  I'll believe it when I see it!  Very frustrating!
  • thebob23

    24 Posts

    85

    0

    Posted October 4th, 2006 19:00

    lowerfloater,
    The person from Dell might have meant 3-5 days after your estimated ship date since that is usually how long they give for standard shipping, but if the customer service meant it'll ship in 3-5 days than you're lucky, good for you... good luck either way.