We have a "NetWorker 9.0.1.6.Build.709" server installation and DataDomain for the backup storage location.
On the Exchange 2013 we have the "NetWorker Module for Microsoft version 9.2.1.194" installed.
The backups go through without errors but the amount of data accumulated is always the full size even though the policy is defined as incr on 6 days and full every Friday..
The result is that the DD get full 100% rather quickly.
I have read the post on another similar case where the problem was with the pool assigned on the client side (if I am not mistaken) but in my case they are empty..
Thinking again about your problem reminded me that we had the same/similar problem a while ago.
As it turned out at that time, it was a wrong configuration/naming issue with respect to the exchange and the DAG clients. This again leads to the fact that the backups are assigned to the wrong client.
nsrclientfix helped to check and correct the issue.
With 9.x the exchange backups with NMM are block-based backups which means that when you do an incremental backup only changed blocks are backed up but the level if I am not wrong, will always show as incremental.
That is normal behavior. Exchange Backups are Block Based Backups and when backing up to a DD Device incr backup will be converted to full (virtual synthetic full). Great Feature: You get full backups at the cost of incrementals...
@ituser, Do you see anything in the logs which says that the backup is being promoted to a full. A complete log from this backup job might help shed some light on what exactly is happening.
ituser
1 Rookie
•
16 Posts
3408
0
Posted April 25th, 2019 00:00
The Full log of the backup is the following:
4/24/2019 8:00:01 PM Action backup traditional 'NMM backup' has initialized as 'backup action job' with job id 2586232
4/24/2019 8:00:01 PM mail-dag-01.xxx.gr:APPLICATIONS:\Microsoft Exchange 2013\DB01 level=incr
4/24/2019 8:00:01 PM mail-dag-01.xxx.gr:APPLICATIONS:\Microsoft Exchange 2013\DB02 level=incr
4/24/2019 8:00:01 PM mail-dag-01.xxx.gr:APPLICATIONS:\Microsoft Exchange 2013\DB03 level=incr
4/24/2019 8:00:01 PM mail-dag-01.xxx.gr:APPLICATIONS:\Microsoft Exchange 2013\DB04 level=incr
4/24/2019 8:00:01 PM mail-dag-01.xxx.gr:APPLICATIONS:\Microsoft Exchange 2013\DB05 level=incr
4/24/2019 8:00:01 PM mail-dag-01.xxx.gr:APPLICATIONS:\Microsoft Exchange 2013\DB06 level=incr
4/24/2019 8:00:01 PM Action backup traditional will run up to 100 jobs in parallel
4/24/2019 8:00:01 PM Policy 'Backup', workflow 'Exchange2013WF on DD160', action 'NMM backup', group 'Exchange2013WF Full Monthly Retention DD160'.
4/24/2019 8:00:01 PM Starting action backup traditional 'NMM backup', which has 1 clients.
4/24/2019 8:00:01 PM mail-dag-01.xxx.gr:savefs started
4/24/2019 8:00:01 PM savefs -s backup.xxx.gr -c mail-dag-01.xxx.gr -g "Exchange2013WF Full Monthly Retention DD160" -p -l full -R -v -F "APPLICATIONS:\\Microsoft Exchange 2013\\DB01" "APPLICATIONS:\\Microsoft Exchange 2013\\DB02" "APPLICATIONS:\\Microsoft Exchange 2013\\DB03" "APPLICATIONS:\\Microsoft Exchange 2013\\DB04" "APPLICATIONS:\\Microsoft Exchange 2013\\DB05" "APPLICATIONS:\\Microsoft Exchange 2013\\DB06"
4/24/2019 8:00:02 PM Group Exchange2013WF Full Monthly Retention DD160 waiting for 1 jobs (0 awaiting restart) to complete.
4/24/2019 8:01:00 PM mail-dag-01.xxx.gr:APPLICATIONS:\Microsoft Exchange 2013\DB01
4/24/2019 8:01:00 PM level=full, vers=pools, p=6
4/24/2019 8:01:00 PM mail-dag-01.xxx.gr:APPLICATIONS:\Microsoft Exchange 2013\DB02
4/24/2019 8:01:00 PM level=full, vers=pools, p=6
4/24/2019 8:01:00 PM mail-dag-01.xxx.gr:APPLICATIONS:\Microsoft Exchange 2013\DB03
4/24/2019 8:01:00 PM level=full, vers=pools, p=6
4/24/2019 8:01:00 PM mail-dag-01.xxx.gr:APPLICATIONS:\Microsoft Exchange 2013\DB04
4/24/2019 8:01:00 PM level=full, vers=pools, p=6
4/24/2019 8:01:00 PM mail-dag-01.xxx.gr:APPLICATIONS:\Microsoft Exchange 2013\DB05
4/24/2019 8:01:00 PM level=full, vers=pools, p=6
4/24/2019 8:01:00 PM mail-dag-01.xxx.gr:APPLICATIONS:\Microsoft Exchange 2013\DB06
4/24/2019 8:01:00 PM level=full, vers=pools, p=6
4/24/2019 8:01:00 PM mail-dag-01.xxx.gr:savefs succeeded.
4/24/2019 8:01:00 PM Exchange2013WF Full Monthly Retention DD160 mail-dag-01.xxx.gr:savefs See the file C:\EMCLegato\nsr\logs\policy\Backup\Exchange2013WF on DD160\NMM backup_2586232_logs\2586235.log for command output
4/24/2019 8:01:00 PM mail-dag-01.xxx.gr:pseudo_saveset started
4/24/2019 8:01:00 PM nsrnmmsv -LL -s backup.xxx.gr -g "Backup/Exchange2013WF on DD160/NMM backup/Exchange2013WF Full Monthly Retention DD160" -a "*policy action jobid=2586232" -a "*policy name=Backup" -a "*policy workflow name=Exchange2013WF on DD160" -a "*policy action name=NMM backup" -y "Wed May 15 23:59:59 GMT+0300 2019" -w "Wed May 15 23:59:59 GMT+0300 2019" -m mail-dag-01.xxx.gr -z -a DIRECT_ACCESS=Yes -o "\"RENAMED_DIRECTORIES:index_lookup=on;REQUESTED_LEVEL:level=incr;\"" -l incr -q -W 78 -N pseudo_saveset "APP
4/25/2019 5:50:29 AM command 'nsrnmmsv -LL -s backup.xxx.gr -g "Backup/Exchange2013WF on DD160/NMM backup/Exchange2013WF Full Monthly Retention DD160" -a "*policy action jobid=2586232" -a "*policy name=Backup" -a "*policy workflow name=Exchange2013WF on DD160" -a "*policy action name=NMM backup" -y "Wed May 15 23:59:59 GMT+0300 2019" -w "Wed May 15 23:59:59 GMT+0300 2019" -m mail-dag-01.xxx.gr -z -a DIRECT_ACCESS=Yes -o "\"RENAMED_DIRECTORIES:index_lookup=on;REQUESTED_LEVEL:level=incr;\"" -l incr -q -W 78 -N pseudo_saveset "APP' for client mail-dag-01.xxx.gr exited with return code 1
4/25/2019 5:50:29 AM job (2586313) host: mail-dag-01.xxx.gr savepoint: pseudo_saveset had ERROR indication(s) at completion
4/25/2019 5:50:29 AM mail-dag-01.xxx.gr:pseudo_saveset failed.
4/25/2019 5:50:29 AM Exchange2013WF Full Monthly Retention DD160 mail-dag-01.xxx.gr:pseudo_saveset See the file C:\EMCLegato\nsr\logs\policy\Backup\Exchange2013WF on DD160\NMM backup_2586232_logs\2586313.log for command output
4/25/2019 5:50:34 AM Action backup traditional 'NMM backup' with job id 2586232 is exiting with status 'failed', exit code 1
From what I can see the save set applies to DAG..
Below it shows that the attempts were made with level Full.. (the final fail was due to the full DD)