powerpath migration enabler for 2-node SQL cluster which has 2 instances on
every node.
Hi;
We have a SQL cluster which consist of 2 physical nodes and every nodes has an instance on it. We bought a new VMAX 400K and we need to migrate this cluster to this new box. Cluster has disks from two EMC boxes. How do we do that? What version of powerpath should i use? Is there any document telling the issue step-by step? Please help.
"Cluster has disks from two EMC boxes. How do we do that? "
Because you want to migrate between EMC array devices, PowerPath Migration Enabler will be the best option.
" What version of powerpath should i use?"
In terms of version to use, we always recommend using the latest version which is 6.0 (GA Dec 8, 2014). As it was mentioned before (dstratton), starting with PP 5.7.x (includes 6.0), PPME feature does NOT require a separate license as it used to in older versions (5.5.x and below). Additionally, a major change was the introduction of "nondisruptive" migration in cluster environment. What i mean about "nondisruptive" is that now, there is no need to shutdown nodes to perform the migration (2008 and up clusters).
" Is there any document telling the issue step-by step? "
Yes, the PPME User Guide has examples of cluster migration and the steps to take, I highly recommend looking through it as was mentioned (dynamox).
dynamox
11 Legend
•
20419 Posts
•
87439 Points
1171
1
Posted June 12th, 2015 11:00
search support.emc.com for document "PowerPath Migration Enabler User Guide "