How to concatenate the backups in Networker ?

Hello,

I'm trying a way to concatenate the backups in Networker.
I've done this in other backup software but have little time as I'm working with Networker.

I thought of something like a post-exec script that would run after the first backup that would be the only scheduled backup.

If someone is already doing something similar and can give me a help I appreciate.

  • guenterH1

    117 Posts

    1368

    0

    Posted June 22nd, 2010 23:00

    Hello,

    I'm not sure whether I understood what you mean with 'concatenate backups'. In NetWorker this term is not known.

    Probably an example from other backup software would help to clarify what steps you mean.

    However NetWorker knows about a backup level consolidate.

    This backup method uses a previous level full backup and a new level 1 (differential) backup which will be merged together to a new full backup.

    This method allows you just to make an initial full backup of your client and then subsequently only differential backups.

    For the last differential is merged to a new full the usual effect differential growing as time goes on is avoided.

    However this backup level consolidate has some limitations, please read the documentation about this carefully.

    Probably this is what you're looking for.

  • PetersonPS

    1 Rookie

    •

    39 Posts

    1368

    0

    Posted June 23rd, 2010 03:00

    Hello, thanks for the feedback.

    I'll try to explain better what I need.

    I want to schedule a GROUP and configure it with a post-exec script, this script will be executed at the end of the backup starting the next group and so on for the following groups.

    I hope it helped you understand better.

  • ble1

    6 Operator

    •

    14354 Posts

    •

    56186 Points

    1368

    1

    Posted June 23rd, 2010 05:00

    What you wish is sort of cascaded backups.  Out of the box, you can't do it, but since you can virtually configure anything in NW there is a way.  One way of doing it is to have master group with some dummy saveset for client.  This client would run savepnpc which would execute groups one by one as soon as previous one completes.

  • coganb

    736 Posts

    1368

    1

    Posted June 23rd, 2010 06:00

    You could also write a script on your server that would check for running savegrp processes and run the next savegrp command from the list once the process is finished.  I haven't tested it but I don't see why it wouldn't work.  That way, you could probably build in extra functionality to deal with a group that is stopped (waiting for a tape for example) so that it wouldn't stop other groups from running.

    -Bobby

  • Phil_1

    20 Posts

    1368

    0

    Posted June 29th, 2010 01:00

    Assume you have client with 4 savesets: C: D: E: F: defined. You can set the parralellism (client properties - Globals (1 of 2)) to 1, in the client, or in the group, or depending on your environment - number of drives - you can set the max sessions (or target sessions).

    Then only one of these will run simultaneuosly. It may not be in the order you wish, however, I still fail to see the reasoning behind why/what you want to achieve. If you can give reasons why you want your exact method, then we can discuss/ help.

    I have many Exchange clients with 4 savesets. I have set the client parrallellism to 3, so all SGs do not run simultaneously. Once the first one finishes, the last one kicks off. Would possibly make more sense for me to set to 2, so that the first 2 would run, both would finish similar times, then the last 2 would run???

    Phil

    when I first started NetWorker, I used to think a "group" as a like minded set of computers, but it is not. A group is a collection of client that start at the same time - much to my dissapointment I used to think this should be called schedule. Also a group helps direct which tape pool to use. "Schedule" is defined more as what level to do, (as opposed to when to start), so I can understand that the terms are not intuitive, even after nearly 10 years of NetWorker.

    Message was edited by: Phil Livingstone

  • Bancal

    1 Rookie

    •

    31 Posts

    1368

    1

    Posted August 22nd, 2013 23:00

    Hello,

    I'm in the process of implementing cascaded backup for a number of hosts (one IBM HTTP server and a couple of WebSphere process servers) . Here is what I have already done. I deployed two sets of probes. The 1st set of probes shuts applications down prior to backup and the second set of probes kicks applications off after backup. For each host I want to backup I have created 3 NetWorker clients: 1st client have have "shutdown" probe associated with it and backs up some folder. The second client have real saveset I want to backup associated with it and, finally 3rd client invokes "kick-off" probe and back up some folder.  Next I created 3 Networker groups. The first group named something like foo_stop incorporates 3 clients with "shutdown" probes. The second group, foo_backup, has 3 clients with actual savesets bount to it. And the 3rd group have 3 clients with "kick off" probes associated with it.

    After that, I have tinkered a script that runs these 3 groups consequently. It looks similar as follows:

    @echo off

    set LogFile=nsrprobe_peprod.log

    echo "Script started..."  >> %LogFile%

    rem Initially run group to stop applications on all clients

    rem First Stop IBM HTTP Server

    savegrp -c httpserver -G foo_Stop

    if %ERRORLEVEL% NEQ 0 goto :FAIL

    echo "httpserver stopped..."  >> %LogFile%

    < >

    rem Now invoke foo_backup group to backup all clients

    rem First backup IBM HTTP Server

    rem savegrp -c httpserver -G foo_Backup

    rem if %ERRORLEVEL% NEQ 0 goto :FAIL

    < >

    rem Finally bring all applications online by using

    rem foo_Start group

    rem start all WebSphere Process Servers

    savegrp -c websphere1 -G foo_Start

    if %ERRORLEVEL% NEQ 0 goto :FAIL

    echo "websphere1 started..."  >> %LogFile%

    << Next I start HTTP server >>


    rem If the program flow managed to get here then our mission is accomplished

    exit 0

    :FAIL

    exit 1

    I put that script on my Windows-based NetWorker server. Next, I have invoked that script a few times to make sure that it works fine. As I launch that script I, see how groups and probes are invoked in a correct order.

    Finally, to put this rather complicated construction in action I have created yet another group named foo. For this group I configured savepnpc backup program and created foo.res file that has the bat file listed above as precmd. 

    The problem is once I kick that foo group off, the precmd script, in turn, kicks foo_stop group off and then the whole backup process gets standstill. The foo group turns to be in the running state whereas foo_stop group is in probing state.