De-comm VxRail
We have one 3 host VxRail cluster that we have already de-comm as it has outlived its lifespan.
What is the best practise to wipe the data/VM in cluster ?
All the production work have already been migrated out.
Only vCenter and VxRail manager is running.
Beside, deleting all the VMDX disk files, what else can we do ?
Responses (1)
Solutions (0)

DELL-Josh Cr
Community Manager
•
9802 Posts
•
45353 Points
1
0
Posted November 12th, 2026 13:26
Hi,
- VxRail Manager backup (VxRail Manager → Administration → Backup → Generate Backup)
- vCenter / ESXi host logs (vSphere Client → Tasks → Export System Logs)
- Hardware inventory (WWN, serial numbers) → CMDB / asset register
- Firmware baseline report (iDRAC → System → Firmware) → save as PDF
1. Factory‑reset iDRAC:
iDRAC → Maintenance → Reset iDRAC to Default Settings (or racadm racreset hard).
2. Reset BIOS/UEFI to defaults:
iDRAC → System → BIOS Settings → Load Defaults.
3. Re‑install the base VxRail‑specific ESXi image (use the VxRail ESXi ISO, do NOT join a vCenter).
4. (Optional) Run the VxRail Installer later if you plan to redeploy the appliance.
5. Capture the new serial numbers, MACs and firmware versions for the asset register.
- Delete any VxRail‑specific dvSwitches, port‑groups and VLANs.
- Remove uplink bindings that pointed to VxRail NICs.
- Release the static IPs assigned to VxRail Manager and the three ESXi hosts back to IPAM.
- Export iDRAC sanitize logs (racadm jobqueue view or download from iDRAC UI).
- Save the “VxRail Manager Backup” file in a secure, offline location.
- Create a “De‑commission Report” PDF that includes:
• Dates/times for each step
• Personnel performing the steps
• Screenshots of iDRAC sanitize completion
• Firmware/OS version list
- Store the report in your compliance repository (e.g., SharePoint, CMDB).