Note: What should be power off first? Switches or Storages??
Note1: As in this example we are talking about Brocade switches the procedures are:
1 Backup configuration
2 Then execute this command: sysShutdown (https://techdocs.broadcom.com/us/en/fibre-channel-networking/fabric-os/fabric-os-administration/9-1-x/Performing-Basic-Configuration-Tasks-Admin1/v26779672/v26746468.html)
Note2: In this environment we have a two back end storages (VNX 5400) and twofront end storages (Vplex v6.2) so we need to know what should be power off first??
Well when the technician finishes their activity we have to perform the power up whit this sequence
For us is just importante the step 2 (red)
*Step by step Power Up as follow : ---------------------------------------------------- 1 step >Network devices & Local network devices 2 step >Storage, Network Storage 3 step >HMC 4 step >Frame 5 step >VIO servers 6 step >VIO clients 7 step >Domino, Aix (applications & Databases)
Note: We should start powering up the SAN Storages Switches
Note2: I Want to know what storage should start first? VNX o Vplex??
Apart from that let me know the procedures to powering off the VPLEXs and VNXs
DELL-Sam L
Community Manager
•
8150 Posts
•
34715 Points
0
0
Posted October 13th, 2023 14:48
Hello Roger Biderbost,
Here is a link to a kb that will be of assistance. https://dell.to/3Qd9NTE
Here is also a link to solve online where you can get the procedures for doing shutdown and power on for your systems. https://dell.to/48LOOPj