When you do group restart (from GUI or from CLI) it will start backup with same level as it was running last time if within restart interval defined in group properties. If not, it will use current schedule. So, if you wish to restart full backup (which is same as starting full backup) much later when, let's say, incremental schedule takes palce, do from CLI savegrp -lfull -c . This example command will run only for with level full.
Not sure I understand last par of the question (well, I'm sure I do not understand it). If you run it from CLI, the level applied is controlled by -l switch (small L). you can use full, incr, or any differential level you want - depending what you wish to do. It does not matter if you have schedule set in client saying something else - schedule/level from group overrides client schedule. And savegrp command from CLI with level set will override whatever is set for level or schedule for that group in GUI.
In NW8 you can kill individual jobs. In NW7 you can abort it with jobkill command, but I never used that for jobs - only for groups. You can stop your group (kill it) and that will do the job. Depending what NW version you run, you can also use hard limit setting to build window frontier within which group can run.
You can kill a job by killing the savegrp process assocaited with it.
Otherwise you can use jobkill to kill individual save jobs.
To restart the backup at the same level, either use the NMC console or from the coomand line with option -R. for eg. if "Windows Corp" backup failed and you wish to restart it at the same level use
Bare in mind that, as in example above, -R won't restart since you are doing it after restart interval since it is running for few days already thus original schedule most likely won't match the day when it is started.
ble1
6 Operator
•
14354 Posts
•
56186 Points
1699
0
Posted July 16th, 2012 17:00
When you do group restart (from GUI or from CLI) it will start backup with same level as it was running last time if within restart interval defined in group properties. If not, it will use current schedule. So, if you wish to restart full backup (which is same as starting full backup) much later when, let's say, incremental schedule takes palce, do from CLI savegrp -lfull -c . This example command will run only for with level full.