How do I manually launch a backup job with a tag other than "N"?
I currently have groups set up that back up separate single resources, have their own specific datasets and schedules, and use a common retention period.
We are only replicating backups tagged "Daily", and nothing else.
I would like to know if there is a way to manually launch a backup outside of the normal schedule, so that the resulting backup job gets tagged with the correct retention flag instead of an "N" (not tagged) which seems to be the default for any manually executed activity. Since we do not replicate backups with an "N" flag, these manual backups are at risk.
Currently, if I need to run a backup before or after the scheduled time, I have been modifying the schedule, and waiting for it to manually kick off at the new time that I set it for. This allows for the backup to run when I want it to, and I also get the proper retention flag. However, I then have to remember to set the schedule back to the original time that it was set for.
Any help would be appreciated - I hope I have explained this correctly...
I may be answering my own question here, but I see that there is a "Run Now" button in the Manage Schedules window. I am wondering if by clicking this button, the Avamar system will run the schedule and include the correct retention flag (not the "N" flag) ?
Ok, I have confirmed that by choosing the schedule of the job that I need to run, and clicking the "Run Now" button, the backup job is run, and the retention flag is set to whatever the schedule is configured for. (The "N" flag is not used...)
I have a similar type of situation. After a lot of testing I determined that with "on-demand" backups there's no way to have Avamar automatically set the retention and expiration date correctly. I ended up writing a script that would kick off the backup, wait for it to finish and then manually set the retention and expiration dates accordingly.
KSchiss
13 Posts
840
0